A 1.6 MW run-of-river plant in the Alaotra-Mangoro region of Madagascar, commissioned in 2022. It is the plant that carried the TC × HIER consortium across the 1 MW line — and turned a proven rural electrification model into a utility-scale template.
Version française →Sahatona sits in Alaotra-Mangoro, Madagascar’s rice belt. It is a run-of-river development: the plant uses the natural flow and head of the river, returns the water to the watercourse after generation, and operates without a large storage reservoir.
Commissioned in 2022, it marked a step change for HIER — the Madagascar partner of the alliance, which had spent more than a decade building village-scale and small regional plants. Sahatona was HIER’s first plant above 1 MW, and the first built to a utility-scale standard: larger electromechanical equipment, a formal control and protection scheme, and a grid-quality supply for productive users, not only households.
The consortium’s scope covered the electromechanical heart of the plant, delivered as one package so that the equipment arrived together with its engineering, its installation supervision and its commissioning team.
Sahatona supplies around 1,500 households, and — the reason this plant matters beyond its capacity figure — it powers rice mills and irrigation pumps in one of Madagascar’s most productive agricultural regions.
That mix changes what the plant has to do. Household demand peaks in the evening; milling and pumping are daytime loads. A plant serving both must hold voltage and frequency across a wide, shifting load curve — which is precisely what a properly engineered control and protection package is for.
Sahatona proved that the delivery model HIER had refined on small plants — local execution, local operation, equipment engineered for the site — scales past the megawatt line. It is the direct template for the six projects totalling 28 MW+ now under construction, where TC is lead equipment supplier and first power is expected in 2026.
| Key fact | Detail |
|---|---|
| Plant | Sahatona HPP |
| Location | Alaotra-Mangoro region, Madagascar |
| Type | Run-of-river |
| Installed capacity | 1.6 MW |
| Commissioned | 2022 |
| Consortium scope | Turbine-generator, control and protection — supply, installation, commissioning |
| Supplied loads | 1,500 households, rice mills, irrigation pumps |
| Status | In operation |