Rooted in Madagascar. 15+ Years of Local Hydropower.

H.I.E.R — Hydro Ingenierie Etudes et Realisations — « Electrifier Madagascar grace a l'hydroelectricite »

HIER is the local execution engine of the TCH HYDRO x HIER alliance — a Malagasy company founded in 2010, operating 5 hydropower plants across 5 regions, serving 6,500+ subscribers and feeding surplus power into the JIRAMA national grid.

7
Plants Built
4 MW
Installed Capacity
20 GWh
Production / Year
6,500+
Subscribers
100
Employees

A Malagasy Developer-Operator with French Engineering DNA

Founded in 2010 by Andre FILLET — a French engineer with 25+ years in Madagascar's energy sector — HIER designs, builds, owns and operates renewable power plants nationwide.

From Hydelec to HIER — a proven track record

HIER's story began under its earlier entity HYDELEC Madagascar, which delivered the Sahanivotry (2008) and Maroantsetra (2010) hydropower plants — infrastructure that still feeds the Antananarivo interconnected grid and the Maroantsetra network today, including dams, headrace canals, penstocks, powerhouses and 20 kV / 63 kV transmission lines.

As HIER, the company added three plants in the Amoron'i Mania region in 2013-2014 — Ankerivato (560 kW), Soavina (60 kW) and Ankilizato (100 kW) — electrifying more than 4,000 households. In 2022, in partnership with ADER, the European Union and the NGO GRET, two more plants entered service: Sahatona (1.6 MW) and Ambatosia Bealalana (1.7 MW).

Full project lifecycle capability

HIER covers design, studies & engineering → construction supervision → construction → operation, with in-house expertise in civil engineering, hydromechanical works, electrical installations and power lines — plus environmental compliance.

Gerant / Founder
Andre FILLET
French engineer, 25+ years in the Malagasy energy sector. Founder of Hydelec Madagascar (2008) and HIER (2010).
Directeur General
Dieudonne RAOELIJAONA
Former senior executive of JIRAMA (national utility). Deep expertise in grid integration, licensing and utility-scale operations across Madagascar.
Legal formMalagasy company (societe de droit malagasy), founded 2010
HeadquartersNear 15, Avenue de l'Independance, Antananarivo — plus 5 regional offices nationwide
Business scopeDevelopment · Construction · Operation of urban & rural power plants; hydro, solar, thermal and wind
Team~100 employees — engineers, technicians, managers, multidisciplinary
JIRAMA integrationSurplus injection into JIRAMA networks: Bealanana (NW) & Fianarantsoa interconnected grid (RI)
Customer systemPrepaid meters with mobile-money top-up (Orange Money SMS) — accessible even to unbanked customers

7 Hydropower Plants Built & Electrifying Madagascar

Every plant below is operational today — powering households, administrations and SMEs across the island.

2008

Sahanivotry Hydropower Plant

First plant delivered under the earlier entity Hydelec Madagascar. Feeds the Antananarivo interconnected network (RI Tana). Scope: dam, headrace canal, penstock, powerhouse.

2010

Maroantsetra Plant + HV Grid

Second Hydelec-era project. Powers the Maroantsetra electricity network, including 20 kV and 63 kV HV transmission lines constructed by the company.

2013-14

Amoron'i Mania Trio Ankerivato 560 kW · Soavina 60 kW · Ankilizato 100 kW

Three plants built by HIER in the Amoron'i Mania region — electrified 4,000+ households and transformed daily life in surrounding communities.

2022

Sahatona & Ambatosia Bealalana 1.6 MW + 1.7 MW

Two new plants commissioned in 2022 in the Haute Matsiatra and Sofia regions, in partnership with ADER, the European Union and GRET. Significantly increased rural electricity access in both regions.

5 Regions. 5 Operational Sites.

Active presence across the island, with regional offices ensuring local proximity to every customer and partner.

Amoron'i Mania
3
Ankerivato, Soavina, Ankilizato + Maromanana / Mania pipeline
Haute Matsiatra
1
Sahatona 1.6 MW (2022)
SOFIA
1
Ambatosia Bealalana 1.7 MW + Antsohihy network extension
SAVA
0
Belaoko Lokoho 8 MW under development (KFW/ADER)
MENABE
1
Ankilizato hybrid: solar 88 kWc + battery + hydro reinforcement

6 Projects Under Development — 28 MW+ in the Pipeline

Backed by international donors (KFW, EU, BAD, USAID, GIZ) and aligned with Madagascar's rural electrification roadmap via ADER.

Belaoko Lokoho
SAVA · Andapa District
8 MW capacity 113 km evacuation 167 km MT grid

Flagship SAVA project. Targets 19 rural communes across Andapa & Sambava districts. Injects into JIRAMA Andapa/Sambava networks. APD complete; PAR & due diligence in progress.

Cofinancing: KFW / ADER — HIER · Target: 175,637 inhabitants, 17,000 subscribers Y1
Angadanoro
ANALAMANGA · Anjozorobe
3 MW capacity 179 km MT line 63 km BT line

Serves 8 rural communes near Anjozorobe and injects into the JIRAMA Anjozorobe + RI Tana grid. Targets 50,529 inhabitants, 4,864 households in Year 1.

Funding: BAD / European Union
Andriambe
ANALAMANGA · Manjakandriana
2.5 MW capacity 24 km MT 12 km BT

Supplies Ambohitrandriamanitra, Sabotsy, Anosibe communes + surrounding villages. Injects into the JIRAMA Antananarivo RI grid. Targets 3,559 inhabitants, 631 households Y1.

Rural electrification + JIRAMA grid injection
Maromanana
AMORON'I MANIA · Fandriana
4.9 MW capacity 94 km MT 98 km BT

Largest planned plant in the Amoron'i Mania cluster. Serves Sandrandahy, Imito, Fiadanana, Mahazoarivo, Alakamisy communes. Injects into JIRAMA Ambositra RI. Targets 102,952 inhabitants, 5,705 households Y1.

Planning: ADER
Mania 1 & Mania 2
AMORON'I MANIA · Ambositra
5 MW each 72 km MT total 30 km BT total

Twin plants at Chute Mahitsiniandro (Mania 1) and Chute Mandeha (Mania 2). Supply Tsarasaotra commune + Ambohitsara fokontany. Inject into JIRAMA Antsirabe/Tana RI. Targets 11,277 inhabitants, 770 households Y1.

Rural electrification + JIRAMA grid injection
Hybrid & Network Extensions
MENABE · SOFIA
88 kWc solar battery storage +100 km MT

Ankilizato (Menabe): solar + battery hybrid to reinforce the existing hydro plant during low-flow season. Antsohihy & Ambatoriha Est (Sofia): 100+ km of MT network extension off the Ambatosia plant to reach 16,000+ new inhabitants.

Hybrid: HIER self-investment · Tsarazaza phase 1: USAID cofinancing

Why HIER is the Right Local Partner for Africa

Beyond construction, HIER operates the plants it builds — giving the TCH x HIER alliance true end-to-end local delivery.

Full-Lifecycle Delivery

Design & engineering, construction supervision, civil & hydromechanical works, electrical installation, power lines, commissioning and long-term O&M — all under one roof.

JIRAMA Grid Integration

Proven experience injecting surplus generation into JIRAMA networks (Bealanana NW, Fianarantsoa/Antananarivo RI) — critical for any utility-scale project in Madagascar.

Prepaid & Mobile Money

Prepaid keypad meters with Orange Money SMS top-up — enabling even unbanked rural customers to access electricity and giving operators predictable cash flow.

5 Regional Offices

On-the-ground presence in every operating region — Amoron'i Mania, Haute Matsiatra, SAVA, SOFIA, MENABE — for fast customer service, maintenance and community relations.

Donor & Government Relations

Active partnerships with ADER, KFW, EU, BAD, USAID, GIZ and GRET — HIER knows how to navigate Malagasy licensing, environmental approvals and donor-funded procurement.

Solar-Hydro Hybrid

Already piloting solar + battery hybridization at Ankilizato (Menabe) to stabilize dry-season output — directly relevant to microgrid and minigrid projects across Africa.

Institutional & Financial Partners
ADER JIRAMA European Union KFW BAD (AfDB) USAID GIZ GRET (NGO)