Côte d'Ivoire

Côte d'Ivoire is West Africa's power hub: 3,019 MW installed (2024), near-universal urban access and exports to six neighbours. Under its Mission 300 national energy pact (US$6.56 B, 2025-2030) and a $300 M US grant ratified in August 2026, the country is modernising its grid and targeting a 45 % renewable share by 2030.

Key data

Electricity access (WDI)72.4 % (2023)
Installed capacity3,019 MW (2024)
Hydropower potentialHydropower expanding — Gribo-Popoli plant commissioned 2024
Utility / grid operatorCI-Energies (planning & assets) · CIE (distribution)
Key factNational Energy Pact: US$6.56 B for 2025-2030 under Mission 300

Data: World Bank World Development Indicators (EG.ELC.ACCS.ZS, 2023), CC BY 4.0 · IHA country profiles.

Hydropower & mini-grid opportunities

Grid modernisation and WAPP regional trade pull demand for switchgear, transformers, protection and SCADA — TC × HIER's electrical-equipment lines. Hydropower keeps growing: Gribo-Popoli joined the fleet in 2024, and further run-of-river sites on the Bandama and Sassandra basins remain to be developed.

Rural electrification is the volume market: the PEPT programme added over 539,000 connections in 2024, and mini-grids extend reach where the grid is thin. Standardised, pre-engineered hydro and hydro-solar mini-grid packages shorten delivery times for such programmes.

Policy & financing updates

  • MCC US$300 M grant ratified 5 August 2026 — WAPP phase 2 and national grid modernisation.
  • National Energy Pact steering committee seated 4 August 2026; 2026-2030 portfolio of ≈CFA 2,840 billion under financing negotiation.
  • 2030 targets: universal access, 45 % renewables in the mix, sector financial sustainability.

FAQ

What is PEPT?

The "Électricité pour tous" programme — the government's connection drive that added over 539,000 new customers in 2024 and lifted coverage to 94.3 % of localities.

What does the MCC grant fund?

WAPP phase 2 and modernisation of the national grid so Côte d'Ivoire can trade more power regionally — substations, lines and control systems.

How can TC × HIER support Ivorian projects?

With MV/HV switchgear, transformers, protection and SCADA, complete turbine units for new hydro sites, and retrofit services for existing plants — with 48-hour quotation on enquiries.

Sources

A project, a site, drawings to discuss? Talk to us — reply within 48 hours.

Request a quotation
24/7 Engineer Chat
售前咨询 / Presales

TCHIER Presales Engineer

Hydropower & Renewable Energy
微电网智巡 / Microgrid
🔧

马达微电网智巡专家

Microgrid Smart Inspection