| | |
Get Quote
Products / Turgo Turbines

Turgo Turbines for Medium-Head Sites

Compact impulse turbine for medium heads: 20–300 m net head, 100 kW to 3,200 kW. Higher flow capacity than Pelton at the same head — a workhorse for rural mini-hydro.

Turgo turbine runner — TC HYDRO manufacturing base

Overview

The Turgo is an impulse turbine where the jet strikes the runner plane at an angle, allowing higher flow and higher specific speed than Pelton at the same head — in a smaller, more compact machine.

Ideal for rural electrification and small agro-industrial plants, TC Turgo units ship complete with nozzle, needle and deflector, and share parts commonality with our Pelton line for easy maintenance.

Typical Applications

  • Medium-head streams (20–300 m net head)
  • Rural mini-grids from 100 kW to 3.2 MW
  • Agro-industrial and small factory power supply
  • Compact powerhouse layouts with limited space

Technical Specifications

Net head20–300 m
Unit output100 kW–3,200 kW
ConfigurationHorizontal, 1–2 jets
Flow regulationSpear nozzle & deflector

Ranges are design envelopes — each unit is engineered to your measured net head and flow.

Scope of Supply — Complete Unit

  • Runner
  • Main shaft
  • Bearings
  • Speed governor
  • Excitation system
  • Inlet valves
  • Control system (SCADA)

In-House Machining & Quality Control

Every runner, shaft and part is machined and inspected in our Zhangjiajie factory — 30,000 m² of land with 14,000 m² of production floor — critical tolerances are never outsourced.

  • CQ5263 vertical lathe — max turning Ø 6,300 mm, workpiece up to 50 t
  • C5235 vertical lathe — Ø 4,000 mm, 30 t
  • CW61125 horizontal lathe — 8,000 mm (shafts & rotors)
  • Z3080 radial drill — Ø 80 mm
  • 315T hydraulic press
  • Runner dynamic balancing on our horizontal balancing machine — imbalance measured and corrected

Engineering ranges

Net head20–300 m
Configurationhorizontal, single jet
Refurbishmentnozzle & needle parts manufactured on plan

Selected track record (all turbine types)

StationTurbine – generator modelSets
Enshi Tangkou, Hubei — HPP modernisation4 × 11 MW units · oil-free blade pitch + governor retrofit4
Laos (export) — Kaplan refurbishment15 MW Kaplan unit refurbishment1
Guangxi, China — six-station renovation programmerefurbishment across six plants6
Gaohua & Jiefangshan, Fujian & Hubeifixed-blade runners converted to adjustable pitch2

Full reference list available on request.

CREDENTIALS

Impulse turbine hall with horizontal impulse turbine-generator units arranged in a row
Impulse turbine hall
Horizontal impulse turbine-generator unit with generator guard
Impulse turbine-generator unit
Vertical lathe machining a large runner
Vertical lathe at work
Turgo unit assembled in the TC works
Turgo unit in the works
Two Turgo units with inlet valves in the TC works
Turgo units with inlet valves

Also available: turbine generators up to 20 MW →

Frequently Asked Questions

What site data do you need to quote a turbine?

Net head and flow are the two essential figures — site location and grid connection point help us refine the layout. Send whatever you have: our engineers will tell you within 48 hours what the free preliminary study requires.

Do you supply spare parts after commissioning?

Yes. Runners, shafts, bearings, nozzles, needles, deflectors, seals and governor parts are manufactured on plan and supplied throughout the plant’s life.

Can you support installation and commissioning on site?

Yes. TC supplies and supervises the electromechanical installation, and HIER Madagascar provides local execution, O&M and logistics across Sub-Saharan Africa.

Request a Quotation →WhatsApp Us
24/7 Engineer Chat
售前咨询 / Presales
⚡

TCHIER Presales Engineer

Hydropower & Renewable Energy
AI O&M Assistant
🔧

TCH Smart O&M Copilot

Africa Hydro · O&M & Operations